Every 30–90 days during heating season
Air Filter Inspection & Replacement
Use MERV 8 to 11 pleated filters. Extremely dense filters (MERV 13+) can create excessive static pressure drop in older ductwork layouts unless specifically engineered for the system.
Twice per heating season
Condensate Drain Trap Flushing (90%+ Units)
Flush the condensate P-trap and vinyl discharge tubing with warm water to prevent microbial sludge accumulation from triggering pressure switch shutoffs.
Regularly after heavy snow or freeze events
Outdoor Vent Termination Clearance
Verify that exterior PVC intake and exhaust pipes remain at least 12 inches above local snow accumulation levels to prevent flue gas recirculating or inducer lockouts.
Annually before peak winter
Annual Professional Combustion & Safety Tune-Up
A qualified technician should conduct a calibrated electronic combustion analysis to verify complete fuel combustion, inspect the heat exchanger for stress fractures, and test all automatic safety shutoff switches.